1. Home
  2. FAQs

Frequently Asked Questions

What’s the delivery time of the products production?

45-60 days after received the deposit payment.

What are the floor requirements to install a lift?

Concrete must be at least 4” thick, in good condition and must be of test strengthen 3,500PSI (250 kg/cm²) minimum.

What are the fluid requirements for lifts?

For a good cylinder life cycle use a brand name hydraulic oil 46#.

What type of electrical requirements do I need?

Standard requirements is 110Volt, 220Volt,230Volt single (1)phase or 380Volt,400Volt,415Volt, three (3)phase.

How about the payment term?

1. 30% paid by wire transfer in advance for order,70% paid before shipment.
2. Irrevocable letter of credit at sight before production.

Menu